| Construction Site | Construction Site | Construction Site |
The raw materials are first evenly fed into the hammer crusher through a vibrating feeder for primary crushing.
After the initial crushing stage, the material is conveyed to the KPC1313 double-chamber hard rock crusher for secondary crushing and shaping.
The processed material is then transported to a set of vibrating screens for screening. Oversized materials are returned to the hard rock crusher for further crushing.
Materials smaller than 1–3 cm are conveyed to a transfer bin and then sent back to the vibrating screens for additional screening.
The screened finished sand is delivered to two wheel sand washing machines for cleaning, producing high-quality finished sand with improved cleanliness.
Mr. Tan, General Manager of Hunan Liuyang Xinlei Building Materials
“We were introduced to Zhongyu Dingli through a friend. After visiting several equipment operation sites, we decided to cooperate with Zhongyu Dingli. We are very satisfied with both the equipment quality and the installation services. In particular, the output capacity and particle shape produced by the KPC1313 double-chamber hard rock crusher have exceeded our expectations.”