Project Description: This project has an annual output of 2 million tons. The limestone ore in the mining area is mainly composed of calcite. The newly built building stone production line adopts the "crushing + washing" process and uses our compan...
Project Description:
This project has an annual output of 2 million tons. The limestone ore in the mining area is mainly composed of calcite. The newly built building stone production line adopts the "crushing + washing" process and uses our company's complete set of mining equipment. The total investment of the project is 96.8453 million yuan, and the environmental protection investment is 6.76 million yuan.
Project Overview:
– Project Location: Dazhou City, Sichuan Province
– Processed Material: Calcite
– Output: 2 million tons per year
– Project Requirements: 0-5mm manufactured sand, 5-10mm gravel, 10-20mm, 20-31.5mm crushed stone
Case Study Site:
Configuration process:
| Process | Equipment Name | Model | Quantity |
|---|---|---|---|
| Primary Crushing | Vibrating Feeder | ZGC2050 | 1 unit |
| Crusher | PCZ1820 | 1 unit | |
| Transfer Silo | Storage Capacity 20,000 tons | — | 1 unit |
| First-stage Crushing | Feeder | ZG1223 | 6 units |
| Crusher | HCS1523 | 1 unit | |
| First Screening | Vibrating Screen | 2YKZ3680S | 2 units |
| Secondary Crushing | Feeder | ZG1223 | 2 units |
| Vertical Shaft Impact Crusher | VSI1263 | 3 units | |
| Secondary Screening | Vibrating Screen | 3YKZ3680S | 2 units |
| Pebble Buffer Silo | Storage Capacity 2,000 tons | — | 1 unit |
| Feeder | ZG1223 | 2 units | |
| Tertiary Crushing | Vertical Shaft Impact Crusher | VSI1263 | 1 unit |
| Tertiary Screening | Vibrating Screen | 2YKZ3070S | 1 unit |
| Sand Washing | Spiral Sand Washer | LXS1890 | 5 units |
| Fine Sand Recovery & Dewatering | Integrated Machine | XSH2455 | 5 units |
| Belt Conveyor | B1400, B1200, B1000, B650 | 18 belts |
Project Features:
The project employs a "crushing + washing" process.
The main products are 0-5mm manufactured sand, 5-10mm gravel, 10-20mm, and 20-31.5mm crushed stone.
The project utilizes a "crushing + washing" process, with the production process as follows:
Mining process flow: Drilling with a down-the-hole drill at the mining face → Medium-deep hole blasting → Loading with a hydraulic excavator → Transporting the ore to the unloading platform at the raw ore stockpile by mining dump trucks.
Processing Area Production Flow: ZGC2050 Feeder → PCZ1820 Crusher → Long Belt Conveyor → Intermediate Silo → ZG1223 Feeder → HCS1523 Impact Crusher → 2YKZ3680S Vibrating Screen → VSI1263 Impact Crusher → ZG1223 Feeder → 3YKZ3680S Screening Machine → Granite Buffer Silo → ZG1223 Feeder → VSI1263 Vertical Impact Crusher → 2YKZ3070S Vibrating Screen → Silo.
Washing Process: Material <5mm from screening enters LXS1890 Sand Washing Machine → XSH2455 Fine Sand Recovery and Dewatering Integrated Machine → Wastewater Collection Tank → Sludge Concentrator → Filter Press.